Goodnight, goodnight, construction site
(CD + Book)
Author
Contributors
Status
Geneva Public Library - Ground Floor Children's Picture Books
J RINKER
1 available
J RINKER
1 available
Description
Loading Description...
Also in this Series
Checking series information...
Copies
Location | Call Number | Status |
---|---|---|
Geneva Public Library - Ground Floor Children's Picture Books | J RINKER | Available |
More Details
Format
CD + Book
Physical Desc
1 sound disc (15 min., 37 sec.) : digital ; 4 3/4 in. + 1 book (unpaged : col. ill. ; 26 cm.).
Language
English
Notes
General Note
Narration with or without page turn signals.
General Note
Book published: San Francisco : Chronicle Books, c2011.
Participants/Performers
Narrated by Dion Graham.
Description
At sunset, when their work is done for the day, a crane truck, a cement mixer, and other pieces of construction equipment make their way to their resting places and go to sleep.
Study Program Information
Accelerated Reader AR,LG,3.8,0.5,148143.
Citations
APA Citation, 7th Edition (style guide)
Rinker, S. D., Lichtenheld, T., Graham, D., & Carroll, J. (2012). Goodnight, goodnight, construction site (Book and CD.). Weston Woods.
Chicago / Turabian - Author Date Citation, 17th Edition (style guide)Sherri Duskey. Rinker et al.. 2012. Goodnight, Goodnight, Construction Site. Weston Woods.
Chicago / Turabian - Humanities (Notes and Bibliography) Citation, 17th Edition (style guide)Sherri Duskey. Rinker et al.. Goodnight, Goodnight, Construction Site Weston Woods, 2012.
MLA Citation, 9th Edition (style guide)Rinker, Sherri Duskey., Tom Lichtenheld, Dion Graham, and Jon Carroll. Goodnight, Goodnight, Construction Site Book and CD., Weston Woods, 2012.
Note! Citations contain only title, author, edition, publisher, and year published. Citations should be used as a guideline and should be double checked for accuracy. Citation formats are based on standards as of August 2021.
Staff View
Loading Staff View.